Plastered Surface at Block-A, 1st Floor Apartments
Plastered Surface at Block-A, 1st Floor Apartments
POP at the ceiling of the Ground Floor (Stilt Park)
POP at the ceiling of the Ground Floor (Stilt Park)
POP at the ceiling of the Ground Floor (Stilt Park)
Plastered Surface at Block-A, 1st Floor Apartments
On-going Brick works at Block -B (1st Floor)
Block-B at a glance from Block-A
Block -B at a glance from the Mid-portion
Brick work at the staircase
Scaffolding on Block-A for the external paster works
Tower B westsouth elevation